- Countywide Resurfacing – Fiscal year 2007/2008 project to resurface segments on the following roads throughout the County: CR-439, CR-44, CR-448A, CR-452, #1254 Hancock Road, #1040 Lakeshore Drive, #4521 Tomato Hill Road, #4189 Troon Avenue, and #1643 Washington Street. The project was awarded to DAB Constructors, Inc. in the amount of $802,928.23. Construction is anticipated to be completed in November 2008.
- #1040 Lakeshore Drive & #0840 Oswalt Road – Intersection improvements and signalization in the Clermont area. The project was awarded to State Asphalt Corporation on July 15, 2008, in the amount of $539,760.75. Construction is anticipated to be completed in January 2009.
- Diane Drive & Lisa Drive – Special assessment project to pave to County standards two roads in the Venetian Village Sorrento Subdivision located in the Lake Jem area: Diane Drive from CR-448 to Lisa Drive and Lisa Drive from Diane Drive to the end (Project No. SA-101). Through a public hearing the project was awarded to Boykin Construction, Inc. on July 15, 2008, in the amount of $282,757.50. Construction is anticipated to be completed in February 2009.
- CR-44A & #5876 Estes Road – Intersection improvements and signalization in the Eustis area. The project was awarded to Boykin Construction, Inc. on August 19, 2008 in the amount of $554,334. Construction is anticipated to be completed in March 2009.
- CR-466 – Widening an existing two-lane highway to four-lanes from Sumter County to #6903 Rolling Acres Road (Segment A) in the Lady Lake area. This is a Transportation Regional Incentive Project with the Florida Department of Transportation (CR-44 from Sumter County to US-27/441). Through a Developer’s Agreement with The Villages of Lake-Sumter, Inc., Segment A was awarded to Rainey Construction, Inc on August 12, 2008. Construction is anticipated to be completed in March 2009.
- #2824 Dewey Robbins Road & #2625 South Dewey Robbins Road – Pave clay roads from #2924 Turkey Lake Road to #2729 East Dewey Robbins Road in the Howey-in-the-Hills area. The project is scheduled to be awarded to Art Walker Construction, Inc. on September 16, 2008, in the amount of $694,904. Construction is anticipated to begin in October 2008.
|
|
|
- Countywide Drainage Improvement Project – Drainage and water quality improvement project in the following four (4) areas: #9788 Acorn Road located along the St. Johns River in the Astor area, #0736 Beverly Court located off Lakeshore Drive in the south Clermont area, #3126 Orange Avenue located along the southern shore of Lake Harris in the Yalaha area, and ##3511D Porto Bello Avenue located along the western shore on Lake Harris in the south Leesburg area. The project is scheduled to be awarded to Blue Ox Land Services, Inc. on October 7, 2008, in the amount of $714,478.85. Construction is anticipated to begin in November 2008.
|
|
|
| |
- CR-452 & #6745 Apiary Road – Construct turn lanes in the Grand Island area. Bids were received on October 3, 2008.
- CR-452 & #6549 South Fish Camp Road/#6847 Fish Camp Road – Construct turn lanes in the Grand Island area. Bids were received on October 3, 2008.
- CR-44 – Widen and resurface from CR-473 to CR-452 in the Eustis/Grand Island/Lisbon area. Bids are scheduled to be received October 23, 2008.
- CR-44 – Construct turn lanes at the intersection of Forest Drive (entrance to Mid-Florida Lakes in the Lisbon area. The project is scheduled to be bid in October 2008. Bids are scheduled to be received October 23, 2008.
- CR-44 & #6041 Shelley Drive – Construct turn lanes at the intersection in the Lisbon area. This is a Local Agency Program project with the Florida Department of Transportation, FM #422420. Bids are scheduled to be received October 23, 2008.
|
|
To check the status of road construction projects on State roads visit the Florida Department of Transportation (DOT). |
|
|